Consider the basic COCOMO model where EE is the effort applied in person-months, DD is the development time in chronological months, KLOCKLOC is the estimated number of delivered lines of code (in thousands) and ab,bb,cb,dba_b, b_b, c_b, d_b have their usual meanings. The basic COCOMO equations are of the form

Select one answerSingle correct

Pick an option to check

Solution

Step-by-step verified solution

Official answer: A) E = ab (KLOC) (bb) , D = cb (E) (db)

COCOMO Model

In the standard Basic COCOMO (Constructive Cost Model):

  1. Effort (EE):

    E=ab(KLOC)bbin person-monthsE = a_b (\text{KLOC})^{b_b} \quad \text{in person-months}

    Here, exp⁡(bb)\exp(b_b) represents the exponent bbb_b.

  2. Development Time (DD):

    D=cb(E)dbin monthsD = c_b (E)^{d_b} \quad \text{in months}

    Here, exp⁡(db)\exp(d_b) represents the exponent dbd_b.

Comparing these standard formulae with the options:

  • (A) correctly defines E=ab(KLOC)exp⁡(bb)E = a_b (\text{KLOC}) \exp(b_b) and D=cb(E)exp⁡(db)D = c_b (E) \exp(d_b).

  • Options (B), (C), and (D) mix up the variables (such as calculating DD directly from KLOC\text{KLOC} or swapping parameters).

Hence, the correct option is A.

Try the question first, then check your work.

Think the official key or this write-up is wrong?

Report error or challenge

Examiner trap

The misconception this question tests

This COCOMO Model previous year question is Q12 of the GATE CSE 2015 Set 2 paper. Find more GATE CSE PYQs on COCOMO Model in Software Engineering, or browse all GATE CSE PYQs.

Free diagnostic

Where do you stand for GATE?

Take the 20-minute diagnostic: the 3 topics that cost you the most marks, and a rank range. Or sit 1 related COCOMO Model PYQs now with no account.

One GATE CSE PYQ every morning

An official question by email at 7 AM IST, with a link to its verified solution. Unsubscribe in one click.

COCOMO Model in GATE CSE

GATE CSE 2015 Set 2 Q12 is the only COCOMO Model question in the GATE CSE papers so far.

How GATE tests COCOMO Model

More from GATE CSE 2015 Set 2

Share this solution

A plain-text card for WhatsApp or Telegram study groups.

GateAI solution cardGATE CSE 2015 Set 2 · Q12 · MCQ

Consider the basic COCOMO model where E is the effort applied in person-months, D is the development time in chronological months, KLOC is the estimated number of delivered lines of code (in thousands) and ab, bb, cb, db have their usual meanings. The basic COCOMO equations are of the form

Topic-wise GATE CS PYQs with verified steps

Independent practice explanation verified by the GateAI team. GATE is conducted by the IITs; question text follows the official paper.