The clock frequency of the processor is f=3 GHz, so the initial clock cycle time is:
T=f1=31 ns Given the relation:
au1=43au2=2au3
Expressing each stage latency in terms of au2:
au1=43au2,au3=83au2
Thus, au2 is the longest stage. The clock cycle time of a pipeline is determined by the maximum stage latency (ignoring register delays):
T=au2=31 ns
From this, we find:
au_1 = 43 \times 31 = 41 ns = 0.25 ns$
au_3 = 83 \times 31 = 81 ns = 0.125 ns$
When the longest stage au2 is split into two equal stages, each new stage has latency:
au2′=2au2=61 ns≈0.167 ns
The new stage latencies are au1=0.25 ns, au2′=0.167 ns, au2′=0.167 ns, and au3=0.125 ns.
The new bottleneck stage is now au1=41 ns.
Therefore, the new clock frequency is:
fnew=max(au1,au2′,au3)1=1/4 ns1=4 GHz